St. Joseph Hospital – NICU & Mother-Baby Unit

Working closely with our client, Healthcare Design & Construction, we were involved in managing the planning and installation of an industrial HVAC and exhaust system, as well as controls for Providence St. Joseph Hospital’s NICU and Mother-Baby Unit – the first of its kind in Orange County, California. The level 2 neonatal intensive care unit … Continued

StoreDot

Working alongside Howard Building Corporation, we worked on a project for StoreDot, a renewable energy company located in Irvine, California. Bringing our knowledge and skillset in industrial HVAC, exhaust, and controls systems, we installed a new HVAC system on the extremely fast charging battery technology campus. This is a new facility that collaborates with professionals … Continued

INX

INX, an International Ink Company located in Buena Park, California, found itself in need of our deep expertise in HVAC, exhaust systems, and controls. Partnering with Caliber Construction, our teams designed a plan to work within the confines of an old warehouse. This existing structure needed new roof top corner HVAC units and an exhaust … Continued

Advantest

In Lake Forest, California, semiconductor company, Advantest needed Contemporary’s HVAC, plumbing, and controls services. Set on a very aggressive construction schedule, our teams got to work installing new chillers outside at ground level. The ultimate goal for the project was to install new Carrier roof mounted heat pumps and Daikin chillers for process cooling. One … Continued

JustFoodForDogs

In the town of Tustin, California, JustFoodForDogs, a retailer for all things dogs, needed a Daikin VRF System for its corporate offices. Working with Howard Building Corporation, our expert HVAC and controls teams collaborated with a mechanical engineer and equipment manufacturer to design state-of-the-art VRF split heat pumps. This unique project involved working within a … Continued

Consumer Direct

In Irvine, California, a commercial tenant company needed to make improvements within a multi-story tenant building. Working with contractor Snyder Langston, the Contemporary Heating & Air Conditioning HVAC installation team began planning around the very limited space available to install ductwork that would align with the design intent of the structure. Our collaboration included assisting … Continued

L3Harris Technologies

Aerospace and defense company, L3Harris, is a technology company that provides military and commercial customers with integrated solutions for their air, land, sea, space, and cyber needs. Located in Yorba Linda, California, L3Harris needed a cooling tower, boiler, pumps, water source heat pumps, and automated controls to all be retrofitted within a very accelerated timeline. … Continued

Christ Cathedral Arboretum

As part of the Diocese of Orange Catholic Church located on 34-acres in Orange, California, Christ Cathedral Arboretum was originally known as Crystal Cathedral. This historical building, designed by renowned architect Philip Johnson in 1980, was built without heating and air conditioning, and when converted, required an all-new HVAC system. However, when our experienced HVAC … Continued

ToughBuilt Industries

ToughBuilt Industries designs, manufactures, and distributes tools and accessories for the building and construction industry. Located in Irvine, California, the company was building out its new corporate office and partnering with Caliber Construction. Our teams worked with Caliber during each phase to replace existing roof top packaged heat pumps and to add a VRF system … Continued

Oakley

Oakley, the world-renowned sunglasses manufacturer was planning to incorporate a state-of-the-art production line into its operation. The problem was that the line needed to be located inside a 20-year-old building that required HVAC upgrades. It is a space that houses multiple trades, and a new system would help to both modernize the HVAC equipment and … Continued